Shri Naveen Patnaink
Hon'ble Chief Minister,Orissa

Projects / Septage Projects / Bhubaneswar Septage Project

► Capacity:75 KLD
► Cost: INR 354Lakhs
► Year of commissioning:June 2018
► Technology: DEWATS technology+ Sludge drying bed
► Catering to population of 1,82,250
► Salient features:
  • SeTP in Bhubaneswar is one-of-its kind in the entire country, which treats both solid and liquid parts of the septage in an integrated manner. The SeTP is designed to treat the liquid part of the septage using DEWATS technology.
  • This is a gravity flow-based system, where septage collected through cesspool emptier trucks is discharged to the receiving chamber from where it flows to different units by gravity. The technology requires least mechanical and electrical interventions to run the process and is cost effective as compared to other technologies.
  • Additionally, the solar photovoltaic (PV) panels installed to generate grid connected solar power to make the plant energy surplus.
  • An additional SeTP of 75 KLD is being constructed at Rokot, Bhubaneswar.